Water Supply Infrastructure
Over the years, George Kent has evolved with developments in the water industry and has cultivated a wealth of knowledge and expertise in serving local and regional markets.
Today, George Kent is a major player in the water supply infrastructure sector with a proven track record that speaks for itself. Excelling in the turnkey construction of major water supply projects, George Kent’s extensive experience has seen the Group successfully complete many water supply-related contracts in the past 20 years.
Throughout the years, the Group has accumulated valuable experience in the turnkey design and build as well as conventional construction of water-treatment plants, specialising in the following:
- Feasibility Studies
- Planning and Design
- Project Management
- Procurement
- M&E Installations
- Testing and Commissioning
- Post-Completion Services such as Operation and Maintenance
The projects undertaken range from new facilities and rehabilitation of existing treatment plants to the laying of pipelines.
Major water projects are as follows:
- Papua New Guinea (PNG) (Investment) Operation and maintenance of Mt. Eriama Water Treatment Plant in Port Moresby, Papua New Guinea [participating as Investor and Operator of the 184 million litres per day (MLD) WTP]
- Panching Water Treatment Plant in Kuantan, Pahang for the East Coast Economic Region – Production capacity: 160 MLD
- Semantan Intake Package 3A of the Pahang-Selangor Raw Water Transfer Programme
- Sungai Selangor Water Supply Scheme Phase 1 – Production capacity: 455 MLD
- Sungai Selangor Water Supply Scheme Phase 3: Rasa Headworks and Bulk Transfer Works – Production capacity: 250 MLD
- A major distribution pumping station project for the Bangkok Metropolitan Waterworks Authority in 1998
- Rehabilitation and Upgrading of Sg. Linggi Water Treatment Plant - Production capacity: 130 MLD
- Teluk Bahang Water Supply Project: Batu Ferringhi Water Treatment Works – Production capacity: 118 MLD