No. | Project Title | Client Name & Contact | Contract Sum (RM) | Contractual Commencement Date | Contractual Completion Date | Scope of Works |
---|---|---|---|---|---|---|
1 | Mengkuang Dam Expansion Project Phase I | Ministry of Energy, Green Technology & Water | 546.30 MIL | 1/8/2011 | 30/05/2017 | Project management for the construction and completion works for Mengkuang Dam Expansion Project. To increase raw water supply capacity from 300 MLD to 1,000 MLD for the consumption of Sg Dua Water Treatment Plant |
2 | Pahang Selangor Raw Water Transfer, Semantan Intake | Ministry of Energy | 2/6/2010 | 30/05/2014 | Intake, Pumping Station and related Works |
|
3 | Panching Water Treatment Works | East Coast Economic Region (ECER) | 129 MIL | 10/8/2010 | 12/8/2013 | Construction and completion of 160 MLD water treatment plant and all associated works |
4 | Proposed Upgrading of Hospital Kuala Lipis | Ministry of Health Malaysia | 97.75 MIL | 26/02/2009 | 25/08/2011 | Design , Construction, Equipping, Commissioning and Maintenance of 106 beds hospital |
5 | Upgrading of Port Moresby Water Supply | Eda Ranu, Port Moresby Papua New Guinea | 3.1 MIL | 31/06/2006 | Design, Engineering Procurement, Installation, Testing and Commissioning of all M & E Works for 100 MLD Raw Water Booster Pump Station |
|
6 | National Sewerage Project | Sewerage | 23.4 MIL | 30/06/2006 | 1. Design, Supply, Installation, Testing and Commissioning of Instrumentation and Scada Systems for 5 Sewage Treatment Plants 2. Rehabilitation and Upgrading of the Existing Kuyoh Pumping Station 3. Electrical Installation Works |
|
7 | Central Kedah (Gurun) Water Supply Project | JBA, Kedah | 5.4 MIL | 1/11/2005 | Design, Supply, Installation, Testing and commissioning of Intake Plant and Instrumentation & Scada System |
|
8 | Sg Muar to Talang Dam Raw Water Transfer Project | JBA, Negeri Sembilan | 17.8 MIL | 28/02/2005 | Design, Engineering, Procurement, Installation, Testing and Commissioning of all M & E Works for 100 MLD Raw Water Intake Plant and Pumping Station |
|
9 | Upgrading of Port Moresby Water Supply, Papua New Guinea | Eda Ranu, Port Moresby Papua New Guinea | 3.139 MIL | 31/10/2004 | Design, Engineering, Procurement, Installation, Testing and Commission of all M & E Works for 50 MLD Filtration Plant and Backwash System |
|
10 | Sg Selangor Water Supply Scheme Phase 3 - Rasa Headworks and Bulk Water Transfer Works - Stage 2 Works | Gamuda-KDEB-TSWA JV | 28 MIL | 31/11/2003 | Design, Engineering, Procurement, Construction, Installation, Testing and Commission of the Mechanical and Electrical Works and Associated Civil Works, Major Components of Works is Intake Plant, Raw Water Pumping Plant, 250 MLD Treatment Plant, Treated Water Pumping Plant, Electrical Plant, Instrumentation 7 Scada System C & S Works |
|
11 | Sg Selangor Water Supply Scheme Phase 3 Package 2 & 4 - Rasa Headworks and Bulk Transfer Works - Stage 1 Works | Gamuda-KDEB-TSWA JV | 136 MIL | 30/11/2001 | Design, Engineering, Procurement, Construction, Installation, Testing and Commission of the Mechanical and Electrical Works and Associated Civil Works, Major is River Gate, Intake Plant, Raw Water Pumping Station, 250 MLD Treatment Plant, Treated Water Pumping Station, Electrical Plant, Generator Plant (2 × 2.4MW) and Instrumentation & Scada System |
|
12 | Rehabilitation and Upgrading of Water Supply System in Malaysia Package 1 - Stage II Sg Linggi Water Treatment Plant | JBA, Negeri Sembilan | 48 MIL | 30/11/2000 | Upgrading of the Existing 70 MLD Sg Linggi Water Treatment Plant to a Total Output of 130 MLD and New Intake Works, Pumping Station, Treatment Plant, Ozone Plant, Electrical Plant and Instrumentation |
|
13 | Teluk Bahang Water Supply Project, Penang | PBA, Penang | 29.2 MIL | 30/09/2000 | Design, Supply, Installation and commissioning of 118 MLD New Treatment Plant, Pumping Plant, Electrical Plant and Generator Plant |
|
14 | Kuala Pilah Treatment Plant | JBA, Negeri Sembilan | 6.4 MIL | Jan 2000 | Turnkey Contract for design and construction of Intake Pumping Plant, 6.8 MLD Treatment Plant, Treated Water Pumping Plant, Pipelines |
|
15 | Sg Kelinchi Pumping Station and Associated Works | JBA, Negeri Sembilan | 15.3 MIL | 1999 | Design, supply, installation, testing and commissioning of 125 MLD Plumping Plant and construction of Pumping Station |
|
16 | Lat Krabang Booster Pump Station | Metropolitan Water Works Authority, Bangkok, Thailand | 13.5 MIL | 1998 | Design, Supply, Installation, Testing and commissioning of 2 Variable Speed Driven Pumpsets, 1 Fixed Speed Driven Pumpset, Electrical Plant and Instrucmentation & Telemetry System |
|
17 | Upgrading Works for Sg Batu and Sg Rangkap Water Treatment Plant | JBA, Selangor | 4.4 MIL | 1998 | Upgrading and Rehabilitation of Sedimentation, Filtration and Chemical Doing Plants |
|
18 | Sg Dua Treatment Plant | PBA, Selangor | 5.4 MIL | 1997 | Proposed Diesel Engine Driven Stand-by Pumpsets and Ancillary Equipment |
|
19 | Port Moresby Water Supply Bot Project | Eda Ranu, Port Moresby, Papua New Guinea | 120 MIL (USD) Note: George Kent is an Equity Shareholder of the Concession Company, PNG Water LTD | June 1997 (22 year concession period | As operator Managing the Operation and Maintenance of the Existing 130 MLD Water Treatment Plant Which is to be Upgraded to 270 MLD in Stages |
|
20 | Kembangan Restu Sg Selangor Water Supply Scheme, Package E-Contract 7 | JBA, Selangor | 2.28 MIL | 1996 | Supply of Instrumentation Panel, Telemetry, Instrumentation System, Cable, Electrical System |
|
21 | New Gemas Water Supply Project, Negeri Sembilan | JBA, Negeri Sembilan | 25 MIL | 1995 | Construction and Commissioning of 43 MLD Water Treatment Plant, River Intakes, Raw Water Pumping Station, Treated Water Pumping Station, Instrumentation, Pipeline and Reservoir |
|
22 | Extension to Bernam Estate Treatment Works, Melaka | Perbadanan Air Melaka (PAM) | 3.55 MIL | 1995 | Design, Supply, Installation, Testing and Commissioning of 54.5 MLD Water Treatment Plant |
|
23 | Sg Selangor Water Supply Scheme Phase 1 - Stage 2, Selangor | JBA, Selangor | 28 MIL | 1995 | Design, Supply, Installation, Testing and Commissioning of Bandscreen and Penstocks, Raw Water Pumpsets, Treated Water Pumpsets, Instrumentation and Telemetry System |
|
24 | Bentong Water Supply Scheme, Pahang | JBA, Pahang | 8.1 MIL | 1993 | Design, Supply, Installation, Testing and Commissioning of RiverGate, Intake Plant, 45.5 MLD Treatment Plant, Pumping Plant, Electrical Plant, Instrumentation |
|
25 | Sg Selangor Water Supply Scheme Phase 1 -Stage 1, Selangor | JBA, Selangor | 102.67 MIL | 1993 | Design, Supply, Installation, Testing and Commissioning of River Gates, Intake Plant, Bandscreen, Penstocks, Portal Crane, Sand Ejector Pump System, Raw Water Pump System, Treated Water Pump System, Booster Pump System, Surge Suppression Systems, Instrumentation, Telemetry System, Overhead Crane, Valves and Pipework |
|
26 | Sg Terip Water Supply Scheme Phase II | JBA, Negeri Smbilan | 1.6 MIL | 1993 | Design, Supply, Installation, Testing and Commissioning of Treated Water Pumping Plant |
|
27 | Bekalan Air Baru Melaka Stage 1 - Contract No.2 | PAM, Melaka | 2.8 MIL | 1992 | Design, Supply, Erection & Commissioning of Water Treatment Plant |
|
28 | Sg Layang Water Treatment Works, Johor | JBA, Johor | 5.3 MIL | 1992 | Operation and Maintenance of 181 MLD Sg Layang Water Treatment Works and Associated Dams, Pipelines and Reservoir |
|
29 | Bukit Dumber Booster Pump Station, Penang | PBA, Penang | 1.6 MIL | 1991 | Design, Supply, Installation and Commissioning of 45.4 MLD Booster Pump Station. |
|
30 | Sg Dua Pumping Station Phase III Extension, Penang | PBA, Penang | 1.6 MIL | 1990 | Design, Supply, Installation and Commissioning of 3 Units of Raw Water Pumpset and 4 Units of Treated Water Pumpset |
|
31 | Sg Ahning Dam | JBA, Kedah | 6.0 MIL | 1989 | Design, Supply, Installation and Commissioning of Steel Intake Gates and Power Packs, Steel Frames and Controls, Steel Intake Stoplogs and Diversion Gate, Associated M & E Plant and Equipment in the Draw-off Tower, Energy Dissipation Valves and Isolation Valves, Instrumentation and Telemetry System |
|
32 | Seberang Tayor Water | Kemaman, Terengganu JBA | 0.12 MIL | 1986 | Supply, Delivery, Installation and Commissioning of 2 Nos.Electric Motor Driven Pumpsets, Instrumentation, Electrical Equipment, Pipework and Ancillary Work |
|
33 | Ampang Line Extension Project | Prasarana Malaysia Berhad | 1,084.45 MIL | 31/07/2012 | June 2016 | The Engineering,, Procurement, Construction, Testing and Commissioning of System Works |
34 | Proposed Upgrading of Hospital Kuala Lipis Phase II | Ministry of Health Malaysia | 57 MIL | 23/10/2014 | 23/04/2017 | Design, Construction, Equipping, Commissioning and Maintenance of 56 beds Hospital |
35 | Mount Eriama Water Treatment Plant, Port Moresby, Papua New Guinea | Eda Ranu, Port Moresby Papua New Guinea | 352 MIL | June 1997 | 2019 | Operation & Maintenance of Mount Eriama Water Treatment Plant |
36 | Construction and Completion of Light Rail Transit Line 3 (LRT3) from Bandar Utama to Johan Setia | Prasarana Malaysia Berhad | 9,000 MIL | 04/09/2015 | 2020 | Procurement and Appointment of Consultants and Contractors including Preparation of Pre-qualification and Tender Documents, Supervision and Management of Consultants and Contractors Appointed to Carry Out the Development of the entire LRT3 including Design, Value Engineering, Manufacture, Deliver, Install, Test, Commission and Making Good Defects of Systems Works, Track Works and all other Infrastructure Works with the aim of ensuring delivery of project |
37 | Construction and Completion of MRT Sungai Buloh-Serdang-Putrajaya Work Package SSP-SY-2014 | MASS Rapid Transit Corporation Sdn Bhd | 1,007 MIL | August 2016 | 2022 | Engineering, Procurement, Construction, Testing and Commissioning of Track Works, Maintenance of Vehicles and Work Trains |
38 | Design and Build 220-Bed Endocrine Hospital in Precinct 7, Putrajaya | Public Works Department, Malaysia, Ministry of Works | 344.24 MIL | December 2016 | April 2022 | Design and Construction of 220-bed Hospital Extension Complex with Link Bridge to Existing Main Block of Hospital Putrajaya and Multi-storey Car Park |
39 | Design and Build 150-Bed District Hospital in Tanjong Karang | Public Works Department, Malaysia, Ministry of Works | 261.50 MIL | November 2016 | July 2022 | Design & Build 150-bed Medical and Ward Block, 30 unit of Houseman’s Quarters, 24 Units of Class “F” and “G” Quarters, 50-pax Child Nursery Centre, Engineering Block, Cafeteria and Visitor Gallery, 2 Fully Equipped Operating Rooms (OR) |